| Town of Neenah Building Inspection Fee Schedule | ||
| Residential Fees | Page 1 | |
| New Residential Construction (1 & 2) Family Homes | ||
| Description | Price | Other |
| 1) Base price for house construction | $225 | County permits required. |
| Plus-finished areas over 1000 sq. ft. | add 10¢ per sq. ft. | |
| Plus-unfinished garage | add 10¢ per sq. ft. | |
| Plus-State Building Seal | add $33 | |
| Plus-Town Fee | add $75 | |
| Plus-Building Escrow | add $300 | Returned after complete final inspection. |
| Plus-RIF | add $300 | Recreational Impact Fee. |
| Plus-CIF | add $200 | Capital Improvement Fee per dwelling unit. |
| Residential Remodeling and Additions | ||
| Description | Price | Other |
| 2) Finished additions | Base fee $80. Add 10¢ | Price includes construction, up to one |
| per sq. ft. for all areas | heating outlet and up to 5 electrical outlets. | |
| involved. **Plus 10% of total | If more than 1 heating or 5 electrical outlets-see | |
| with a $10 minimum. | below permits. County permits required. | |
| 3) Remodeling | Base fee $50. Add 10¢ | Price includes construction, up to one |
| per sq. ft. for all areas | heating outlet and up to 5 electrical outlets. | |
| involved. **Plus 10% of total | If more than 1 heating or 5 electrical outlets-see | |
| with a $10 minimum. | below permits. County permit-possibly required. | |
| 4) Non finished additions, garages, | Base fee $35. Add 5¢ per | Price includes construction only. |
| decks, accessory buildings, and | sq. ft. for all areas involved. | County permits required in most cases. |
| outdoor wood burning structures. | **Plus 10% of total with a | |
| minimum of $10. | ||
| 5) Other minor work | $35. ** Plus 10% of total | Window and door alterations, foundation |
| with a $10 minimum. | repairs, etc. | |
| 6) Electrical | Base fee $35. | Base fee includes one service panel. |
| New circuits | $2.00 each | |
| Alterations to existing circuits | 50¢ per opening | |
| Additional service or feeder panel | $20 each | |
| **Plus 10% of total with a | ||
| $10 minimum. | ||
| 7) Plumbing | Base Fee $35. Plus $3 per | Per fixture: new construction-yes. |
| fixture or piece of equip- | remodeling: any drain or supply pipes-yes, | |
| ment. ** Plus 10% of total | if just fixture replacement-no. | |
| with a $10 minimum. | ||
| 8) HVAC, furnace replacements, & | Base fee $35. Plus $25 | Base fee includes one furnace or A/C unit. |
| outdoor wood burners. | for duct work alteration & | |
| $25 for additional furnace | ||
| or A/C units. ** Plus 10% of | ||
| total with $10 minimum. | ||
| ** Town Fees | Jun-09 | |
| Town of Neenah Building Inspection Fee Schedule | ||
| Commercial Fees | Page 2 | |
| New Commercial Building, Additions, and Alterations. | ||
| Description | Price | Other |
| 9) Construction | Base fee $40 plus 6¢ per | County permits required. |
| sq. ft. **Plus 10% of total | State plan approval required if over | |
| with $10 minimum. | 25,000 cubic feet in most cases. | |
| 10) Capital Improvement Fee (CIF) | 200 per multi-family dwelling | Any new commercial building. |
| $300 up to 3,000 sq. ft. | ||
| $400 up to 10,000 sq. ft. | ||
| $500 over 10,000 sq. ft. | ||
| 11) Electrical | Base fee $25 plus 2¢ per | |
| sq. ft. **Plus 10% of total | ||
| with $10 minimum. | ||
| 12) Plumbing | Base fee $25 plus 2¢ per | State plan approval required if 16 or |
| sq. ft. **Plus 10% of total | more plumbing fixtures installed. | |
| with $10 minimum. | ||
| 13) HVAC | Base fee $25 plus 2¢ per | State plan approval required if over |
| sq. ft. **Plus 10% of total | 25,000 cubic feet in most cases. | |
| with $10 minimum. | ||
| ** Town Fees | ||
| Commercial remodeling and minimal trade work for new construction and additions. | ||
| Description | Price | Other |
| 14) Construction | Base fee $40 | Base fee-County permits required. |
| Construction costs up to $100,000 | Plus $5 per $1,000 | Add to above base fee. |
| Construction costs over $100,000 | Plus $2.50 per $1000.00 | Add to the two above fees. |
| **Plus 10% of total with | (State plan approval required if over | |
| $10 minimum. | 25,000 cubic feet in most cases) | |
| 15) Electrical | Use residential fees | |
| 16) Plumbing | Use residential fees | |
| 17) HVAC | Use residential fees | |
| ** Town Fees | ||
| Other | ||
| Description | Price | Other |
| 18) Razing | Base fee $35 | |
| **Plus $10 | ||
| 19) Re-inspection fee | Base fee $35 | |
| **Plus $10 | ||
| 20) Special inspection/meeting fee | Base fee $35 | Includes 1/2 hr. $35 per hour after. |
| **Plus $10 | ||
| 21) Work started before permit | Up to double fees | |
| issuance | ||
| 22) Records research | Base fee $35 per hour | |
| **Plus $10 | ||
| 23) Culvert permit | Base fee $135 per culvert. | Town roads only. |
| **Plus $15 per culvert. | ||
| 24) Moving permits | ||
| Buildings under 500 sq. ft. | $40 per building | |
| Buildings 500 sq. ft. and over. | $90 per building | |
| **Plus $10 per building | ||
| 25) Permission to start foundation | Base fee $35 | Start at own risk! Permit applicant must get |
| **Plus $10 | County approval before starting. | |
| 26) 911-address sign | **$80 | Required for all structures. |
| ** Town Fees | June-09 | |