|
Town of Neenah Building Inspection Fee Schedule |
||
|
Residential Fees |
Page
1 |
|
|
New Residential Construction (1 & 2) Family Homes |
||
|
Description |
Price |
Other |
|
1) Base price for house
construction |
$250 |
County permits required. |
|
Plus-finished areas over
1000 sq. ft. |
add 10¢ per sq. ft. |
|
|
Plus-unfinished garage |
add 10¢ per sq. ft. |
|
|
Plus-State Building Seal |
add $33 |
|
|
Plus-Town Fee |
add $75 |
|
|
Plus-Building Escrow |
add $300 |
Returned after complete
final inspection. |
|
Plus-RIF |
add $300 |
Recreational Impact Fee. |
|
Plus-CIF |
add $200 |
Capital Improvement Fee per
dwelling unit. |
|
Residential Remodeling and Additions |
||
|
Description |
Price |
Other |
|
2) Finished additions |
Base fee $80. Add 10¢ |
Price includes
construction, up to one |
|
|
per sq. ft. for all areas |
heating outlet and up to 5
electrical outlets. |
|
|
involved. **Plus 10% of total |
If more than 1 heating or 5
electrical outlets-see |
|
|
with a $10 minimum. |
below permits. County permits
required. |
|
3) Remodeling |
Base fee $50. Add 10¢ |
Price includes
construction, up to one |
|
|
per sq. ft. for all areas |
heating outlet and up to 5 electrical
outlets. |
|
|
involved. **Plus 10% of total |
If more than 1 heating or 5
electrical outlets-see |
|
|
with a $10 minimum. |
below permits. County
permit-possibly required. |
|
4) Non finished additions,
garages, |
Base fee $35. Add 5¢ per |
Price includes construction
only. |
|
decks, accessory buildings,
and |
sq. ft. for all areas
involved. |
County permits required in
most cases. |
|
outdoor wood burning structures. |
**Plus 10% of total with a |
|
|
|
minimum of $10. |
|
|
5) Other minor work |
$35. ** Plus 10% of total |
Window and door
alterations, foundation |
|
|
with a $10 minimum. |
repairs, etc. |
|
6) Electrical |
Base fee $35. |
Base fee includes one
service panel. |
|
New circuits |
$2.00 each |
|
|
Alterations to existing
circuits |
50¢ per opening |
|
|
Additional service or
feeder panel |
$20 each |
|
|
|
**Plus 10% of total with a |
|
|
|
$10 minimum. |
|
|
7) Plumbing |
Base Fee $35. Plus $5 per |
Per fixture: new
construction-yes. |
|
|
fixture or piece of equip- |
remodeling: any drain or supply
pipes-yes, |
|
|
ment. ** Plus 10% of total |
if just fixture
replacement-no. |
|
|
with a $10 minimum. |
|
|
8) HVAC, furnace
replacements, & |
Base fee $35. Plus $25 |
Base fee includes one
furnace or A/C unit. |
|
outdoor wood burners. |
for duct work alteration
& |
|
|
|
$25 for additional furnace |
|
|
|
or A/C units. ** Plus 10% of |
|
|
|
total with $10 minimum. |
|
|
** Town Fees |
Jul-11 |
|
|
Town of Neenah Building Inspection Fee Schedule |
||
|
Commercial Fees |
Page
2 |
|
|
New Commercial Building, Additions, and Alterations. |
||
|
Description |
Price |
Other |
|
9) Construction |
Base fee $40 plus 7¢ per |
County permits required. |
|
|
sq. ft. **Plus 10% of total
|
State plan approval
required if over |
|
|
with $10 minimum. |
25,000 cubic feet in most
cases. |
|
10) Capital Improvement Fee
(CIF) |
200 per multi-family
dwelling |
Any new commercial
building. |
|
|
$300 up to 3,000 sq. ft. |
|
|
|
$400 up to 10,000 sq. ft. |
|
|
|
$500 over 10,000 sq. ft. |
|
|
11) Electrical |
Base fee $35 plus 2¢ per |
|
|
|
sq. ft. **Plus 10% of total
|
|
|
|
with $10 minimum. |
|
|
12) Plumbing |
Base fee $35 plus 2¢ per |
State plan approval
required if 16 or |
|
|
sq. ft. **Plus 10% of total
|
more plumbing fixtures
installed. |
|
|
with $10 minimum. |
|
|
13) HVAC |
Base fee $35 plus 2¢ per |
State plan approval
required if over |
|
|
sq. ft. **Plus 10% of total
|
25,000 cubic feet in most
cases. |
|
|
with $10 minimum. |
|
|
** Town Fees |
||
|
Commercial remodeling and minimal trade work for new
construction and additions. |
||
|
Description |
Price |
Other |
|
14) Construction |
Base fee $40 |
Base fee-County permits
required. |
|
Construction costs up to
$100,000 |
Plus $5 per $1,000 |
Add to above base fee. |
|
Construction costs over
$100,000 |
Plus $2.50 per $1000.00 |
Add to the two above fees. |
|
|
**Plus 10% of total with |
(State plan approval
required if over |
|
|
$10 minimum. |
25,000 cubic feet in most
cases) |
|
15) Electrical |
Use residential fees |
|
|
16) Plumbing |
Use residential fees |
|
|
17) HVAC |
Use residential fees |
|
|
** Town Fees |
||
|
Other |
||
|
Description |
Price |
Other |
|
18) Razing |
Base fee $35 |
|
|
|
**Plus $10 |
|
|
19) Re-inspection fee |
Base fee $35 |
|
|
|
**Plus $10 |
|
|
20) Special
inspection/meeting fee |
Base fee $35 |
Includes 1/2 hr. $35 per
hour after. |
|
|
**Plus $10 |
|
|
21) Work started before
permit |
Up to double fees |
|
|
issuance |
|
|
|
22) Records research |
Base fee $35 per hour |
|
|
|
**Plus $10 |
|
|
23) Culvert permit |
Base fee $135 per culvert. |
Town roads only. |
|
|
**Plus $15 per culvert. |
|
|
24) Moving permits |
|
|
|
Buildings under 500 sq. ft. |
$40 per building |
|
|
Buildings 500 sq. ft. and
over. |
$90 per building |
|
|
|
**Plus $10 per building |
|
|
25) Permission to start
foundation |
Base fee $35 |
Start at own risk! Permit
applicant must get |
|
|
**Plus $10 |
County approval before
starting. |
|
26) 911-address sign |
**$80 |
Required for all
structures. |
|
** Town Fees |
July-11 |
|